<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:dc="http://purl.org/dc/elements/1.1/">
  <channel>
    <title>PlanLens Blog — Construction Delay Analysis Insights</title>
    <link>https://plan-lens.com/blog</link>
    <description>Expert insights on construction delay analysis, SCL Protocol, liquidated damages, Time Impact Analysis and forensic programme analysis for construction disputes.</description>
    <language>en-GB</language>
    <managingEditor>blog@plan-lens.com (PlanLens)</managingEditor>
    <webMaster>blog@plan-lens.com (PlanLens)</webMaster>
    <lastBuildDate>Sat, 15 Mar 2026 09:00:00 +0000</lastBuildDate>
    <ttl>1440</ttl>
    <image>
      <url>https://plan-lens.com/logo.png</url>
      <title>PlanLens</title>
      <link>https://plan-lens.com</link>
      <width>144</width>
      <height>144</height>
    </image>
    <atom:link href="https://plan-lens.com/blog/rss.xml" rel="self" type="application/rss+xml"/>

    <item>
      <title>Time Impact Analysis: The Definitive Guide for Construction Claims</title>
      <link>https://plan-lens.com/blog/time-impact-analysis-guide</link>
      <description><![CDATA[
        <p>Time Impact Analysis is the methodology that courts, arbitrators and adjudicators expect when a contractor claims an extension of time. Done correctly, it is compelling evidence. Done poorly, it collapses under cross-examination.</p>
        <p>This guide walks through every step of the TIA process — from establishing the baseline programme to producing a court-ready forensic report — with worked examples and practical tips for construction lawyers and planners.</p>
        <p>Topics covered: establishing the baseline, updating the programme, identifying impacting events, calculating critical path impact, addressing concurrent delay, and compiling the forensic report.</p>
        <p><a href="https://plan-lens.com/blog/time-impact-analysis-guide">Read the full article →</a></p>
      ]]></description>
      <author>blog@plan-lens.com (PlanLens Editorial)</author>
      <category>Delay Analysis</category>
      <category>SCL Protocol</category>
      <category>Time Impact Analysis</category>
      <category>Construction Disputes</category>
      <pubDate>Sat, 15 Mar 2026 09:00:00 +0000</pubDate>
      <guid isPermaLink="true">https://plan-lens.com/blog/time-impact-analysis-guide</guid>
      <dc:creator>PlanLens Editorial</dc:creator>
    </item>

    <item>
      <title>Liquidated Damages: What Contractors Get Wrong Every Time</title>
      <link>https://plan-lens.com/blog/liquidated-damages-contractor-mistakes</link>
      <description><![CDATA[
        <p>Liquidated damages are one of the most misunderstood mechanisms in construction contracts. Contractors routinely make avoidable mistakes that cost them millions.</p>
        <p>This article covers the seven most common errors — from failing to serve timely notices to the misapplication of the prevention principle — and explains how to avoid each one.</p>
        <p>Topics covered: the LD vs penalty distinction, the Cavendish Square test, notice requirements, the prevention principle, concurrent delay and the practical steps to protect your position.</p>
        <p><a href="https://plan-lens.com/blog/liquidated-damages-contractor-mistakes">Read the full article →</a></p>
      ]]></description>
      <author>blog@plan-lens.com (PlanLens Editorial)</author>
      <category>Liquidated Damages</category>
      <category>Construction Contract Law</category>
      <category>Extension of Time</category>
      <pubDate>Fri, 28 Feb 2026 09:00:00 +0000</pubDate>
      <guid isPermaLink="true">https://plan-lens.com/blog/liquidated-damages-contractor-mistakes</guid>
      <dc:creator>PlanLens Editorial</dc:creator>
    </item>

    <item>
      <title>Adverse Weather Claims: How to Prove Your Extension of Time</title>
      <link>https://plan-lens.com/blog/adverse-weather-extension-of-time</link>
      <description><![CDATA[
        <p>Weather delay claims are among the most frequently pursued — and most frequently lost — in construction disputes. The reason is almost always the same: inadequate evidence.</p>
        <p>This article explains exactly what data you need, how to obtain it from the Met Office and ERA5 reanalysis datasets, and how to present it compellingly in adjudication or arbitration.</p>
        <p>Topics covered: the "exceptionally adverse" test under JCT, the NEC 60.1(13) once-in-ten-years threshold, obtaining meteorological evidence, and structuring the claim in adjudication.</p>
        <p><a href="https://plan-lens.com/blog/adverse-weather-extension-of-time">Read the full article →</a></p>
      ]]></description>
      <author>blog@plan-lens.com (PlanLens Editorial)</author>
      <category>Force Majeure</category>
      <category>Adverse Weather</category>
      <category>Extension of Time</category>
      <category>NEC Contracts</category>
      <pubDate>Thu, 12 Feb 2026 09:00:00 +0000</pubDate>
      <guid isPermaLink="true">https://plan-lens.com/blog/adverse-weather-extension-of-time</guid>
      <dc:creator>PlanLens Editorial</dc:creator>
    </item>

    <item>
      <title>SCL Protocol 2nd Edition: What Changed and Why It Matters</title>
      <link>https://plan-lens.com/blog/scl-protocol-second-edition-changes</link>
      <description><![CDATA[
        <p>The Society of Construction Law published the second edition of its Delay and Disruption Protocol in February 2017 — nearly fifteen years after the first. The changes were substantial.</p>
        <p>This practitioner's guide breaks down the key differences: the new treatment of concurrent delay, the preference for prospective TIA, the expanded guidance on disruption claims, and the stronger emphasis on contemporaneous records.</p>
        <p>Topics covered: concurrent delay under the 2nd Edition, preferred delay analysis methodology, disruption claim guidance, the contemporaneous records requirement, and the position on global claims.</p>
        <p><a href="https://plan-lens.com/blog/scl-protocol-second-edition-changes">Read the full article →</a></p>
      ]]></description>
      <author>blog@plan-lens.com (PlanLens Editorial)</author>
      <category>SCL Protocol</category>
      <category>Delay Analysis</category>
      <category>Construction Adjudication</category>
      <pubDate>Wed, 29 Jan 2026 09:00:00 +0000</pubDate>
      <guid isPermaLink="true">https://plan-lens.com/blog/scl-protocol-second-edition-changes</guid>
      <dc:creator>PlanLens Editorial</dc:creator>
    </item>

  </channel>
</rss>
